Manufacturing begins after the process route, equipment arrangement and critical interfaces have been reviewed. This reduces changes to foundations, conveying, extraction and access after equipment reaches the site.

Delivery sequence
#

  1. Process and layout confirmation.
  2. Structural fabrication and machining.
  3. Mechanical and electrical assembly.
  4. Pre-delivery inspection and logic checks.
  5. Installation guidance and commissioning.

Manufacturing checkpoints
#

StructureMain-frame geometry, supports, guarding interfaces, lifting points and access provisions.
Mechanical assemblyDrive alignment, conveyors, feeding and discharge interfaces, lubrication and maintainability.
Electrical integrationPLC logic, sensors, interlocks, operator controls and upstream/downstream signals.
Plant readinessFoundations, installation space, crane access, utilities, ducting and commissioning conditions.
Hengliang Lankang billet equipment assembly site

Workshop and project evidence
#