Manufacturing begins after the process route, equipment arrangement and critical interfaces have been reviewed. This reduces changes to foundations, conveying, extraction and access after equipment reaches the site.
Delivery sequence#
- Process and layout confirmation.
- Structural fabrication and machining.
- Mechanical and electrical assembly.
- Pre-delivery inspection and logic checks.
- Installation guidance and commissioning.
Manufacturing checkpoints#
| Structure | Main-frame geometry, supports, guarding interfaces, lifting points and access provisions. |
|---|---|
| Mechanical assembly | Drive alignment, conveyors, feeding and discharge interfaces, lubrication and maintainability. |
| Electrical integration | PLC logic, sensors, interlocks, operator controls and upstream/downstream signals. |
| Plant readiness | Foundations, installation space, crane access, utilities, ducting and commissioning conditions. |

Workshop and project evidence#